Basic Electrical Engineering - Electrical Engineering (MCQ) questions and answers for Q. 9057

Q.  For improving the soil condition and efficiency of earthing system, the pit area around the G.I. pipe is filled with
- Published on 02 Sep 15

a. Mixture of copper and nickel
b. Mixture of chloride and sodium
c. Mixture of aluminium and sulphate
d. Mixture of salt and coal

ANSWER: Mixture of salt and coal

Post your comment / Share knowledge


Enter the code shown above:

(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)