Construction and Demolition Waste Management Rules, 2016
Q. Which of the following is/are true regarding Construction and Demolition Waste Management Rules, 2016?
1) It is not mandatory for the waste generators to be waste collectors.
2) Waste generators shall pay relevant charges for collection, transportation, processing and disposal as notified by the concerned authorities.- Published on 30 Mar 16a. Only 1
b. Only 2
c. Both 1 and 2
d. Neither 1 nor 2
ANSWER: Only 2
- Every waste generator shall be responsible for collection, segregation of concrete, soil and others and storage of construction and demolition waste generated separately, deposit at collection centre so made by the local body or handover it to the authorised processing facilities, ensure that there is no littering or deposition so as to prevent obstruction to the traffic or the public or drains.
- Waste generators shall pay relevant charges for collection, transportation, processing and disposal as notified by the concerned authorities.
- This will ensure Sustainability of Waste Management System for C&D Waste