Full form of P.D.S.A. Cycle - Metrology & Quality Control

Q.  What is meant by P, D, S and A in PDSA cycle?
- Published on 07 Aug 15

a. Progress Development Study Act
b. Plan Do Study Act
c. Project Development Study Act
d. Prevention Do Study Act

ANSWER: Plan Do Study Act
 

    Discussion

  • Sravanthi   -Posted on 27 Oct 15
    - PDCA cycle was being proposed by Deming to solve problems. PDCA stands for Plan-Do-Check-Act.

    - PDCA cycle was modified as PDSA cycle. In the modified cyle, check (C) is replaced by study (S).

    - The process is being studied instead of just checking.