Numerical - Average demand for given load factor and maximum demand

Q.  Determine the average demand of a plant if its load factor and maximum demand are 0.60 and 30 MW.
- Published on 21 Nov 15

a. 20 MW
b. 18 MW
c. 50 MW
d. 13 MW

ANSWER: 18 MW
 

    Discussion

  • kripalsinh   -Posted on 22 Jan 20
    load factor = average demand / maximum demand
    average demand = load factor maximum demand