Numerical - Load factor for given load pattern and power factor
Q. An industrial consumer has a load pattern of 2000 kW 0.8 lag for 12 hours and 1000 kW unity power factor for 12 hours. What is the load factor?- Published on 21 Nov 15a. 0.5
b. 0.55
c. 0.6
d. 0.75
ANSWER: 0.75