Q. Match the following List 1 to List 2:
a. Project Risk ------------- i. Threaten the quality and timeliness of the software to be produced.
b. Technical Risk ---------- ii. Threaten the viability of the software to be built.
c. Business Risk ----------- iii. Threaten the project plan. - Published on 30 Jul 15a. a - iii, b - ii, c - i
b. a - ii, b - iii, c - i
c. a - iii, b - i, c - ii
d. a - i, b - ii, c - iii
ANSWER: a - iii, b - i, c - ii