Ways to deal with Risk - Risk analysis and management
Home
>>
Category
>>
Software Testing (MCQ) questions and answers
>>
Risk analysis and management
Q. Which is / are the ways to deal with a Risk?
- Published on 14 Aug 15
a.
Mitigate
b.
Contingency
c.
Transfer
d.
Ignore
e.
All of the above
ANSWER: All of the above
Related Content
Incident Management (
7
)
SDLC (
45
)
Agile testing (
9
)
Smoke and Sanity testing (
4
)
Static analysis tools (
6
)
Use cases and Decision table (
4
)
Roles in Software Testing (
5
)
Independent testing team (
6
)
Test processes (
16
)
Structure based testing techniques (
5
)
Risk analysis and management (
20
)
Configuration management (
6
)
Boundary value analysis (
11
)
Testing types and levels (
30
)
Capability maturity model integration (
6
)
Acceptance testing (
7
)
Static testing techniques (
9
)
Basic concepts of Software Testing (
63
)
Software Testing Techniques (
12
)
Software Testing Strategies (
13
)
Software Project Planning (
10
)
Software Design Concept (
13
)
Software Configuration Management (
10
)
Load Runner (
25
)
Manual testing (
58
)
QC (
26
)
QTP (
25
)
Selenium (
26
)
Discussion
Prajakta Pandit
-Posted on 05 Nov 15
What is Risk?
- Risk is the future uncertain events with a probability of occurrence and a potential for loss.
- Risks are identified, classified and managed before actual execution of program. These risks are classified in different categories, such as
- Schedule Risk
- Budget Risk
- Operational Risk
- Technical Risk
- Programmatic Risk
- Risk is a possibility, not a certainty.
- The following ways are deals with a risk :
- Mitigate
- Contingency
- Transfer
- Ignore
Mitigate
: Mitigate against a risk is probably the most commonly mitigation of risk used under the risk management technique. It is also the easiest way to understand and implement.
Transfer
: Transference is a risk management strategy that is not used very often and tends to be more common in projects where there are several parties.
Ignore
: You can also change your plans completely to ignore the risk. This is a good strategy when a risk has a potentially large impact on your project.
Contingency
: It is an estimation of the financial resources needed to cover all identified project risk in an optimum manner.
➨
Post your comment / Share knowledge
Required!
Required!
Invalid Email Id!
Required!
Enter the code shown above:
Please enter the code shown above
(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)
MCQs
English
Tutorials
Download
▲