Which standards cannot be used for cost control?

Q.  Which of the following standards cannot be used for cost control?
- Published on 14 Sep 15

a. Basic Standard
b. Normal Standard
c. Both a and b
d. None of the above

ANSWER: Both a and b
 

    Discussion

  • Jyoti   -Posted on 21 Oct 20
    It's answer is (d) none of the above because both of these are types of standard cost and used to minimize/control cost...

Post your comment / Share knowledge


Enter the code shown above:

(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)