Prepare
Practice
Interview
Aptitude
Reasoning
English
GD
Placement papers
HR
Current affairs
Engineering
MCA
MBA
Online test
Login
Online Practice Test
>
Manual testing
« Previous
Next »
Testing beyond normal operational capacity is:
Options
- Load testing
- Performance testing
- Stress testing
- All of these.
CORRECT ANSWER : Stress testing
Discussion Board
Discussion
I think answer should be (iv) option "All of these". Because Stress testing means "Testing beyond Max operational capacity to the point from where performance goes down."
Beyond Normal operational capacity to max operational capacity is Load testing.
and these two type of testing are the part of Performance testing.
Abhishek Agrawal 10-5-2015 06:14 AM
« Previous
Next »
Write your comments
*
*
Email must be in the form someone@domain.com
*
*
Enter the code shown above:
Please enter the code shown above
(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)
Related Content
Testing (25)
Testing (25)
Testing skills - Freshers (20)
Testing skills - Experienced (20)
Load Runner (30)
Manual testing (70)
QC (30)
QTP (30)
Selenium (30)
Winrunner (30)
SDLC (30)
Advertisement
▲