____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system.

Options
- Stress testing.
- Load testing.
- Spike testing.
- All of these.


CORRECT ANSWER : Spike testing.

Write your comments


Enter the code shown above:

(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)


Advertisement