Prepare
Practice
Interview
Aptitude
Reasoning
English
GD
Placement papers
HR
Current affairs
Engineering
MCA
MBA
Online test
Login
Online Practice Test
>
Manual testing
« Previous
Next »
____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system.
Options
- Stress testing.
- Load testing.
- Spike testing.
- All of these.
CORRECT ANSWER : Spike testing.
« Previous
Next »
Write your comments
*
*
Email must be in the form someone@domain.com
*
*
Enter the code shown above:
Please enter the code shown above
(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)
Related Content
Testing (25)
Testing (25)
Testing skills - Freshers (20)
Testing skills - Experienced (20)
Load Runner (30)
Manual testing (70)
QC (30)
QTP (30)
Selenium (30)
Winrunner (30)
SDLC (30)
Advertisement
▲