1) Which of these software characteristics are used to determine the scope of a software project?
a. Only performance.
b. Only context.
c. Information objectives, function, performance
d. None of the above.
Answer
Explanation
|
ANSWER: Information objectives, function, performance
Explanation: No explanation is available for this question!
|
|
2) Which level of sub-system is used of an application?
a. Application level
b. Component level
c. Modules level
d. None of the above
Answer
Explanation
|
ANSWER: Component level
Explanation: No explanation is available for this question!
|
|
3) SDLC is not a well-defined, structured sequence of stages in software engineering to develop the intended software product.
a. True
b. False
Answer
Explanation
|
ANSWER: False
Explanation: No explanation is available for this question!
|
|
4) In the Empirical Estimation Technique which model is developed by Barry W. Boehm?
a. Putnam model
b. COCOMO
c. Both A & B
d. None of the above
Answer
Explanation
|
ANSWER: COCOMO
Explanation: No explanation is available for this question!
|
|
5) From the following select the correct option that is used to display the available option for selection.
a. Check-box
b. Text-box
c. Button
d. Radio-Button
Answer
Explanation
|
ANSWER: Radio-Button
Explanation: No explanation is available for this question!
|
|
6) CMM model in Software Engineering is a technique of ______ .
a. Develop the software.
b. Improve the software process.
c. Improve the testing process.
d. All of the above.
Answer
Explanation
|
ANSWER: Improve the software process.
Explanation: No explanation is available for this question!
|
|
7) Transformers is one of the broad category used to classify operations.
a. True
b. False
Answer
Explanation
|
ANSWER: False
Explanation: No explanation is available for this question!
|
|
8) The tools that support different stages of software development life cycle are called as ______ .
a. CASE Tools
b. CAME tools
c. CAQE tools
d. CARE tools
Answer
Explanation
|
ANSWER: CASE Tools
Explanation: No explanation is available for this question!
|
|
9) Which is not a step of Requirement Engineering?
a. Requirements elicitation
b. Requirements analysis
c. Requirements design
d. Requirements documentation
Answer
Explanation
|
ANSWER: Requirements design
Explanation: No explanation is available for this question!
|
|
10) Which of the level carries out goal, objective, work tasks, work products and other activities of the software process?
a. Performed
b. INCOMPLETE
c. Optimized
d. Quantitatively Managed
Answer
Explanation
|
ANSWER: Performed
Explanation: No explanation is available for this question!
|
|
11) If you have no clue of how to improve the process for the quality software which model is used?
a. A Continuous model
b. A Staged model
c. Both A & B
d. None of the above
Answer
Explanation
|
ANSWER: A Staged model
Explanation: No explanation is available for this question!
|
|
12) In Software validation, requirements can be checked against following conditions:
1) If they can be practically implemented 2) If they are valid and as per functionality and domain of software 3) If there are any ambiguities 4) If they are completed
a. True
b. False
Answer
Explanation
|
ANSWER: True
Explanation: No explanation is available for this question!
|
|
13) In OOD, the attributes(data variables) and methods( operation on the data) are bundled together is called _______ .
a. Classes
b. Objects
c. Encapsulation
d. Inheritance
Answer
Explanation
|
ANSWER: Encapsulation
Explanation: No explanation is available for this question!
|
|
14) Which design defines the logical structure of each module and their interfaces that is used to communicate with other modules?
a. High-level designs
b. Architectural designs
c. Detailed design
d. All mentioned above
Answer
Explanation
|
ANSWER: Detailed design
Explanation: No explanation is available for this question!
|
|
15) Which tools are used in Implementation, Testing and Maintenance?
a. Upper case tools
b. Lower case tools
c. Integrated case tools
d. None of the above
Answer
Explanation
|
ANSWER: Lower case tools
Explanation: No explanation is available for this question!
|
|
16) Which tools are used for project planning, cost, effort estimation, project scheduling and resource planning?
a. Process modeling tools
b. Project management tools
c. Diagram tools
d. Documentation tools
Answer
Explanation
|
ANSWER: Project management tools
Explanation: No explanation is available for this question!
|
|
17) Which design deals with the implementation part in which it shows a system and its sub-systems in the previous two designs?
a. Architectural design
b. High-level design
c. Detailed design
d. Both A & B
Answer
Explanation
|
ANSWER: Detailed design
Explanation: No explanation is available for this question!
|
|
18) Modularization is a technique to divide a software system into multiple discrete and independent modules.
a. True
b. False
Answer
Explanation
|
ANSWER: True
Explanation: No explanation is available for this question!
|
|
19) What is the project and process level that provides the Quality Metric benefit?
a. Defect amplification
b. Defect removal efficiency
c. Measuring quality
d. All mentioned above
Answer
Explanation
|
ANSWER: Defect removal efficiency
Explanation: No explanation is available for this question!
|
|
20) Cohesion metrics and coupling metrics are metrics in which level of design?
a. User interface design
b. Pattern-based design
c. Architectural design
d. Component-level design
Answer
Explanation
|
ANSWER: Component-level design
Explanation: No explanation is available for this question!
|
|
21) Which condition defines the circumstances for a particular operation is valid?
a. Postcondition
b. Precondition
c. Invariant
d. None of the above
Answer
Explanation
|
ANSWER: Precondition
Explanation: No explanation is available for this question!
|
|
22) Which subsystem implements a repository that encompasses the following elements,
1) Content database 2) Database capabilities 3) Configuration management functions
a. The publishing subsystem
b. The management subsystem
c. The collection subsystem
d. None of the above
Answer
Explanation
|
ANSWER: The management subsystem
Explanation: No explanation is available for this question!
|
|
23) Which is not a SQA activity?
a. Black box testing
b. White box testing
c. Integration testing
d. Unit testing
Answer
Explanation
|
ANSWER: White box testing
Explanation: No explanation is available for this question!
|
|
24) PAD is metric indicates the number of classes that can access another class attributes and a violation of encapsulation.
a. True
b. False
Answer
Explanation
|
ANSWER: True
Explanation: No explanation is available for this question!
|
|
25) Find out which phase is not available in SDLC?
a. Coding
b. Testing
c. Maintenance
d. Abstraction
Answer
Explanation
|
ANSWER: Abstraction
Explanation: No explanation is available for this question!
|
|